New build · Somerset Levels

Rhyne House

No. 02 of 20

Location
Godney, near Glastonbury
Completed
2023
Size
220 m², three bedrooms
Planning
Flood zone 3, approved in nine weeks

A Passivhaus raised on a concrete plinth above the flood line, beside the rhyne and a row of old pollarded willows.

See the section and the flood line
Rhyne House, a long black timber house on a concrete plinth beside a rhyne and pollarded willows

Kate and Joe farmed the fields round Godney for twenty years and wanted to stay on the land when they stopped. The field floods most winters. So the house sits on a plinth 900mm above the highest water anyone remembers, and it needs almost no heating at all.

Architect
Hunnel: Isla Hunnel, Hannah Vowles
Builder
Greenslade Timber Frame, Street
Passivhaus consultant
Levels Energy Design
Structural engineer
Mendip Structures
Photography
James Corrie, Bristol
Certification
Passivhaus Classic, 2023

01

The site

A flat field at the end of a drove, with a rhyne along one edge and a line of willows that Joe has pollarded every few years since he was a boy. Most winters the field sits under a few inches of water for a week or two. We read the flood marks on the gateposts and talked to the drainage board before we drew a line.

The flooded field at Godney with a rhyne and a row of pollarded willows

02

Building above the water

The field is in flood zone 3, where the starting answer is no. We showed the floor would sit above the hundred-year flood level with room for climate change, that the plinth would not push water onto the neighbours, and that the family could walk out along the drove if the water came up. Approved under delegated powers in nine weeks.

Pencil section of the house raised on its plinth above the flood line, beside the rhyne
Long section, the plinth and the flood line
The living room with a deep window seat looking out to the rhyne and the willows
Living room and the rhyne

03

Building it

The timber frame was made in a workshop in Street as insulated wall cassettes and craned onto the plinth in six days, so the shell was dry before the autumn rain. The airtightness test came in at 0.3 air changes an hour, half the Passivhaus limit. Last winter the heating cost £190.

Timber wall cassettes being craned onto the concrete plinth, with the willows behind
October 2022, the wall cassettes going on
Black larch cladding and a deep-set window above the concrete plinth, with frost on the grass

“We watched the field flood in February from the sofa, warm, with the heating off. That still feels like a magic trick.”

Kate and Joe Pople · Rhyne House, Godney